A Concrete Driveway in Royal Palm Beach Starts at the Property Line
The stretch you see from the garage is the easy half. The harder half sits between the street edge and your lot line, where the swale, the sidewalk and the apron live. A different office writes that spec in every town we pour in. Royal Palm Beach Concrete Co is Locally Owned & Operated, and we build driveways across the county: new ones for fresh lots, extensions beside an existing slab, and full tear-out replacements when the old surface is done.
A typical job is a two-car driveway of about 500 to 700 square feet, broom finished, 4 to 5 inches thick over a compacted base. Before we quote it, we want your survey, a look at how water leaves the lot, and a straight answer on what the driveway has to carry: two cars, a boat trailer, a gate, a basketball hoop. The free written estimate for a concrete driveway names the thickness, the old surface we haul off, the finish, the joints and the permit route. Where the rules differ most, each town gets its own page: Wellington, West Palm Beach, The Acreage and Greenacres.
Driveway Excellence
A good one is decided before the truck arrives: a base graded to drain, forms set and ready for the form board inspection, joints drawn on paper and a broom finish that grips when wet. The quote writes down the thickness, the reinforcement, the finish and the old surface we haul off, so you can hold the pour to it. A two-car job runs about 500 to 700 square feet at 4 to 5 inches thick, priced after a free site visit.

Apron, Width and Permit Office by Place
Same pour, different paperwork. Here's how the swale crossing and the permit route change from place to place.
| Place | Who permits | What changes the pour |
|---|---|---|
| Royal Palm Beach | Village Building Department (Community Development) | 6 in. concrete across the swale and sidewalk crossing, form board and final inspections, 2 ft off the lot lines |
| Wellington | Village Building Division; Engineering on lots of 1 acre or more | Apron 6 in. at 3000 PSI with no steel or mesh, 2 ft setback, no coating on the apron |
| The Acreage | Palm Beach County for the lot, ITID for the swale and culvert | ITID permit, staked swale, form board inspection before concrete goes over the culvert |
| Greenacres | City Building Division | One driveway per house, 30 ft total width, 5 ft from the side line |
| West Palm Beach | City Development Services; a City permit to cross the sidewalk | 20 ft maximum at the property line on homes under three units; apron agency depends on whether the road is City, County or FDOT |
| County roads, unincorporated | County Building Division; Engineering Land Development for a turnout | 12 to 24 ft connection width, 2 ft side setback, stamped work in the right-of-way needs a recorded removal agreement |
Not on the list? Boynton Beach, Lake Worth Beach, Riviera Beach and the smaller towns each run their own desk. We confirm yours before the quote goes out. The concrete permits guide sorts the offices by town.

What It Costs
Typical prices for a 4 to 5 inch broom finish, across our service area.
| Concrete driveway, new pour | $7 to $13 | $3,500 to $9,100 for a typical 2-car driveway of about 500 to 700 sq ft | Thickness, swale crossing length, access, old slab removal |
|---|---|---|---|
| Tear-out of an existing driveway | Adds $2 to $4 | Added to the new-pour price | Thickness, rebar or mesh in the old slab, haul distance |
Three Aprons, Three Specs: the Village, Wellington and The Acreage
For a concrete driveway in Royal Palm Beach, the Village sheet sets 12 feet for one car and 20 feet for two. Inside the swale the driveway and the sidewalk it crosses go in at 6 inches, the sidewalk crossing gets a half-inch expansion joint on each side, and the apron stays 3 feet off the projected line at the sidewalk. The Village also wants 75 percent of the front yard planted or at least 1,000 square feet, and that's why a widening can stall at the permit desk. See the Village driveway standards sheet for the full list.
Wellington reads differently. Its Driveway Packet asks for a 6 inch apron at 3000 PSI without steel or wire mesh, and the formboard inspection checks that the pitch sheds storm water. Lots of an acre or more pull an engineering permit instead of a building permit.
The Acreage is a two-agency job. The County permits the work on the lot, but Indian Trail Improvement District owns the swale and the culvert. Its permit carries a $250 layout and inspection fee, staff stake the swale grades, and the form board gets inspected before concrete covers the pipe. In the easement the ITID detail calls for 6 inches of 4,000 psi concrete over 4 inches of compacted sand, with 8 inches of cover over the culvert. The Acreage driveways and slabs guide walks through that sequence.

How the Job Goes
Free site visit
We walk the lot with your survey, check the swale and measure.
Written quote
A detailed written quote arrives before any work begins.
Permit and inspections
The permit holder requests the form board and final inspections your town requires, and we plan the pour around them.
Pour and cure
We pour, finish, joint and cure it, then walk it with you.
Wet Sand, Rain and Pour Timing
Riviera fine sand covers much of the Village, and the USDA describes it as poorly drained with a water table that can rise to about 10 inches below the surface at its highest, for two to four months in most years. The coastal ridge is the opposite: St. Lucie and Paola sands drain fast. That difference shows up in the base. On wet ground we dig out soft spots, bring in clean fill in lifts and compact each one, because a driveway can't be stronger than the sand under it.
The wet season runs from May 15 to October 15, and the West Palm Beach airport averages about 62 inches of rain a year. We watch the radar the morning of a pour, avoid the hottest hours, and we don't sprinkle water on the surface to ease finishing. The ready-mix industry's hot-weather guidance warns against that. On a windy, dry day we use windbreaks or an evaporation retarder because plastic shrinkage cracks start when the surface loses water faster than it bleeds. Curing starts the moment finishing is done and runs at least three days, and up to seven when the schedule allows. Concrete that dries out early can lose as much as half its potential strength.

Thickness, Reinforcement and Joints We Put in the Quote
Trade guidance puts the minimum for a residential driveway at 4 inches, and the Village sheet agrees on the lot side. Going to five adds roughly 20 percent to the concrete cost for about 50 percent more load capacity, according to the trade guidance we follow. If a delivery truck, a motorhome or a loaded trailer will cross it, we recommend the extra inch and say so in writing. Edges get a thickened rim of one to two inches, and the apron follows whatever the local sheet says, even when that's thicker than the rest of the driveway.
Reinforcement depends on the office. Welded wire fabric and synthetic fibers both appear in the Florida Residential Code as crack-control options for slabs on the ground. Fibers at 1 to 2 pounds per cubic yard cut plastic shrinkage cracking, but they don't let you pour thinner. Wellington bans steel in its apron. ITID's easement detail sets 6 inches at 4,000 psi. The Village sheet sets a floor of 4 inches at 2,500 psi on the lot. So the quote names the reinforcement for your address, not one recipe for everywhere.
Control joints go in at no more than 10 feet apart on a 4 inch pour, cut to a quarter of the thickness, with isolation joints wherever the driveway meets the garage slab, a sidewalk or a column. Joints are where a slab chooses to crack, so we lay them out from a drawing, not from habit.

Tear-Out, Base, Forms and Pour Day
- Locate and layout. We confirm the 811 ticket (Florida requires it at least two full business days before digging), mark the edges and agree the finished grade at the garage door.
- Demolition. The old surface is broken up, hauled off and kept out of the swale. Tear-out adds $2 to $4 per square foot to the price.
- Base and forms. We grade, compact and set boards to the pitch the inspector will check, ready for the form board inspection the permit holder requests where your town requires one.
- Pour and finish. The mix is placed, screeded, floated and broomed. Joints are tooled or sawcut while the surface can still be cut cleanly.
- Cure and protect. Curing compound or wet cover goes on right after finishing. We tape off the area and keep sprinklers, pets and cars away.
- Final inspection and walk-through. We sit down with you after the town signs off and after the pour has had its week.
Widening, Extending and Matching an Old Driveway
An extension looks simple. It isn't. Wellington requires an expansion to match the existing one in material and color. Greenacres allows only one driveway per house and caps the total width at 30 feet, and a semicircular driveway needs a lot at least 100 feet wide. West Palm Beach allows a single driveway up to 20 feet wide at the property line on homes with fewer than three units. The Village counts every added foot against its front-yard planting rule. Those numbers decide how wide the new section can legally be before we talk about looks.
We plan for matching color on an older slab. We don't promise it. Concrete weathers, and a fresh pour next to a ten-year-old one will read lighter at first. If you want the seam to disappear, the honest answer is to replace the whole visible surface or add a deliberate border, and we price both options. A stamped border or a colored band can make the new section look intended.
Corner lots add their own rule. On local streets under County Engineering's driveway rules, a corner-lot driveway must sit at least 35 feet from where the projected right-of-way lines meet, measured to the near edge of the driveway pavement.
Sidewalks, Walkways and Replacing a Worn Surface
Sidewalk Specialization
Entry walks and sidewalk crossings run on their own numbers. Our range for sidewalks and walkways is $8 to $14 per square foot, so a 4 foot wide by 40 foot walk (160 square feet) comes to $1,280 to $2,240, with a free written estimate after we see the site. Where the apron crosses a public sidewalk in the Village, the crossing is 6 inches thick with a half-inch expansion joint on each side, and a new sidewalk cross slope can be no steeper than 2 percent. We quote the front walk with the main pour so the base work is done once. The sidewalk page has the details.
Comprehensive Repair and Resurfacing Services
When the old surface has cracked through, heaved over roots or settled where water collects, we look at the whole slab before we price anything. If the surface has failed, the straight answer is a tear-out and a new pour: the old slab comes out, the base is regraded and the apron is formed to the sheet your town uses. Tear-out adds $2 to $4 per square foot to the $7 to $13 range. The quote names the permit office for your address and the forms it asks for, and none of it starts until you have signed.
Permit, Notice of Commencement, HOA and 811 Before We Pour
Don't assume a small driveway job skips the permit. The County's Building Official has written that the state's under-$7,500 exemption does not apply anywhere in the county, and a few cities, Boynton Beach and Lake Worth Beach among them, describe their own request process. So we send you to your permit office by name and ask you to confirm before work starts. In the Village, starting work without a permit costs four times the calculated permit fee.
If the contract is above $2,500, Florida law requires a Notice of Commencement recorded before work begins, signed by the owner. A copy goes to the building department before the first inspection when the contract passes $5,000. Your HOA can add its own approval on color, width and material, separate from the permit. We supply dimensions and sketches for the forms, but the Notice of Commencement is yours to sign: the statute says no one else may sign it in the owner's place. The driveway cost guide walks through what goes into the total.
Mailboxes, Gates, Lights and Other Things in the Path
Before we form anything, we walk the edge of the work and note what's in the way: mailbox posts, irrigation heads, gate tracks, lamp posts, meter boxes and cleanouts. Each has a decision attached. A mailbox may need to move back. A sprinkler line may need sleeving under the new surface so nobody has to cut it later. The Village sheet bars trees, hedges, posts and other above-ground obstructions inside the driveway area, so a post standing in the new footprint has to move. It is just as specific about drainage structures, cleanouts and valve boxes inside the new area: they are incorporated in the new surface, so the lids and the grade have to be planned before the pour.
Basketball hoops, gate posts and lighting conduit are easiest to sleeve or set during the pour rather than drilled afterward. If your lot slopes toward the garage, tell us at the estimate, because the fall at the door and the low point at the street decide whether a trench drain or a regrade is needed. The grading rule is strict too: work may not alter the original grading levels of the lot or drain onto neighboring lots.
Cost of a Two-Car Pour, Before and After Tear-Out
Our range for a concrete driveway in Royal Palm Beach is $7 to $13 per square foot for a standard broom finish, and a typical job lands between $3,500 and $9,100. A 20 by 24 foot driveway is 480 square feet, so $3,360 to $6,240 at those rates; a 600 square foot job is $4,200 to $7,800. Demolition and haul-off adds $2 to $4 per square foot. What pushes you toward the high end: a 5 inch pour, a long swale crossing, a gate or tight access for the truck, an older slab with roots under it, and stamped or colored finishes, which we price on their own sheet.
Everything here is a range until we see the lot. The free written estimate arrives before any work begins and itemizes each of those drivers, so you can set it next to any other bid line by line.
Why Homeowners Call Us
Why We Stand Out
We are Locally Owned & Operated. There's a reason why Palm Beach homeowners voted us #1 Trusted Concrete Contractors. What you can check is on paper: a detailed written quote before any work begins, the thickness and reinforcement named for your address, and the permit office and inspections listed by town. The free written estimate costs nothing, and nothing is dug until you sign.
A Full Spectrum of Services
This is one of five kinds of poured work we quote. New pours, extensions beside an old slab, full replacements, entry walks and stamped borders all use the same base and drainage planning, so they can share a visit, and the quote lists each pour as its own line. If you also want a patio or a garage or shed slab, we price the pours together.
Accessibility and Reliability
Reaching us is simple: fill out the quote form or call, answer a few questions about the lot, and we schedule the site visit. Reliable means the quote is signed before the first stake goes in, the start date is agreed with you, and we tell you which inspections your town requires. When rain shifts a pour, we move the day and tell you.
Concrete Driveways and Sidewalks Services by Area
The apron rules and the permit desk change at each town line, so here is the work grouped by place:
- A concrete driveway in Royal Palm Beach, our home base, follows the Village sheet.
- Wellington: 6 inch apron at 3000 PSI without steel, formboard inspection first.
- The Acreage: ITID permit for the swale and culvert on top of the County.
- Greenacres: one driveway per house and a 30 foot total width.
- West Palm Beach: City permit to cross the sidewalk.
- Nearby: Lake Worth Beach, Boynton Beach, Loxahatchee Groves and Riviera Beach, each with its own permit desk.
The full list of towns is on the service area page.
Get a Free Written Estimate for a Concrete Driveway in Royal Palm Beach
Send us your address, the width you want, and whether an old one is coming out. For a concrete driveway in Royal Palm Beach we visit, take measurements against your survey, and write up the quote. If you're also planning a back patio, a garage or shed slab or a front walkway, we can price the pours together so the base work is done once. Tell us your town on the contact page, or check the service area to see which office covers you. Have your survey, any HOA guidelines and photos of the old surface ready if you can, and tell us the date you'd like to be parking on it. The right permit route is part of what you're paying for, and we put each step in writing before anything is dug.
Questions We Get
Is 4 inches enough for a concrete driveway in Royal Palm Beach, or should I pay for 5?
Can I widen for a third car?
When can I park on the new pour?
Do you use rebar, wire mesh or fibers?
Does a tear-out cost more than a first-time pour?
Do I need a permit for a replacement?
Will an extension match the old slab?
Can you color or stamp the pour?
Sources we used
- Driveway Standards, Residential, Village of Royal Palm Beach
- Driveway Packet, Village of Wellington
- ITID Driveway Installation, Repair and Removal Policy, Indian Trail Improvement District
- Residential Driveways, Palm Beach County Engineering
- HB 803 Public Memo, Palm Beach County PZB
- CIP 11 Curing In-Place Concrete, NRMCA
- Concrete Driveway Installation: 8 Essentials, Concrete Network
